Iowa Army National Guard Readiness Center

Client: Iowa Army National Guard | Davenport, IA
Back to Projects

Services Provided:

  • CAD Coordination
  • Design-Build
  • HVAC
  • Plumbing
  • Site Utilities
Project Scope and Bio:
  • Complete Plumbing and HVAC installation and BIM coordination plus design assistance
  • 12,000 linear feet of piping for the HVAC systems
  • VRF systems totaling 100 tons of cooling and 1,748,436 BTUH of heating capacities
  • (4) outdoor units installed in mechanical room, (13) branch selector boxes, and (78) indoor fan coil units
  • 14,000 linear feet of piping for the plumbing systems
  • 275 plumbing fixtures
  • Site utility water and septic system installation and design assistance
  • 20,000 gallon precast septic tank installation
Project Awards:

ABC National Pyramid Award