Services Provided:
- Mechanical
Project Bio:
- Heating and ventilating a 111,000 sq. ft. indoor practice facility for the University of Iowa’s football program.
- Over 17 miles of radiant heat tubing was installed under the artificial turf to control the climate in the building.
- Seven-stage multi-stack heat pumps utilize the chilled water systems as a well field to extract heat and transfer it to the radiant tubing at a maximum temperature of 150°F.