Services Provided:

  • Mechanical

Project Bio:

  • Heating and ventilating a 111,000 sq. ft. indoor practice facility for the University of Iowa’s football program.
  • Over 17 miles of radiant heat tubing was installed under the artificial turf to control the climate in the building.
  • Seven-stage multi-stack heat pumps utilize the chilled water systems as a well field to extract heat and transfer it to the radiant tubing at a maximum temperature of 150°F.