Client: Burlington Community School District | Burlington, Iowa
Back to Projects
Services Provided:
- General Contractor
- Mechanical
- Plumbing
Project Scope and Bio:
- Demo and removal of existing cooling tower
- Demo and removal of two existing chillers – craned from basement mechanical room, through roof opening, into the parking lot
- Installation of two 250-ton air cooled chillers
- Installation of boiler plus associated expansion tank and air separator
- Installation of two 40-hp heat pumps
- Installation of two 100-gallon water heaters